A system for a wear-resistant, waterproof and very soft running track was needed. This should permanently withstand sharp women’s shoe heels, drinks (e.g. coffee and soft drinks) and daily machine cleaning. The original coating was not up to these loads. After the order was placed for the entire area, the work was completed within 14 days.
The application was carried out in the following steps:
Sealing of the walkway
Dubai
UAE
2016
2000 m²
JBR
Inhouse
VIP Coatings Intl GmbH & Co.KG (EN)