Dairy Factory Colanta

The floor was applied in a processing room for ripened cheeses, where sharp and large elements frequently fall to the floor.
When the old coating was removed, a surface with a high degree of humidity was found and the temperature in the room was lower than 17 ° C.

The VIP certified applicator – AMC POLIURETANOS effectively and technically manages all the challenges to finish the application during the 3 days that was the maximum time granted by the client.

As a result the final client is included in the list of VIP satisfied customers, specifying our system for future refractions and process plants around the national territory.

Reference profile

Reference profile

Project description: Recoating of the production area

City: Bogota

Country: Columbia

Year: 2019

Size in m²: 3200 m²

Client: Colanta Dairy Factory

Approved applicator AMC POLIURETANOS

Pictures from the project

VIP systems in this project

No data was found
SYSTEME

Schnell-Anfrage

VIP WORLDWIDE

Jetzt Ansprechpartner finden!

Quick-Request

VIP WORLDWIDE

Find your contact now!

QUICK REQUEST

VIP WORLDWIDE

Find your contact now!