Misk Foundation Headquarters

VIP Coatings provided a seamless and high-performance waterproofing system

The design of the Misk Foundation Headquarters emphasizes environmental sustainability and targets LEED Gold certification, reflecting a strong commitment to green building practices and a healthy, energy-efficient work environment. VIP Coatings successfully supplied the VIPShield waterproofing system to IKK-BMC, the certified applicator for the project. The podium and planter box waterproofing works covered a total area of 15,000 m².

The system consisted of a two-component, solvent-free epoxy primer (QUICKPRIME 2K EPOXY SF), followed by the application of QUICKSEAL PP350, a high-performance, hot-sprayed pure polyurea coating applied at 2 mm thickness. This advanced solution ensures a seamless, durable, and long-lasting waterproofing system, ideally suited for high-profile and sustainable structures.

[Rendering of HQ: Doug & Wolf; Architects: Conrad Gargett]

Reference profile

Reference profile

Project description: Podium and planter boxes waterproofing

City: Riyadh

Country: Saudi Arabia

Year: 2025

Size in m²: 15.000 m²

Client: MISK

Consultant: Atkins

Approved applicator Isam Kabani Co. - BMC

Main contractor: FREYSSINET SAUDI ARABIA CO.

Pictures from the project

VIP systems in this project

VIPSHIELD

VIPSHIELD is a roof sealing and insulating coating system for commercial roofs. It eliminates the need for thick concrete screeds and can be applied directly to the construction concrete or directly to steel roofing structures improving installation times and reducing costs.
SYSTEME

QUICK REQUEST

VIP WORLDWIDE

Find your contact now!

Quick-Request

VIP WORLDWIDE

Find your contact now!

QUICK REQUEST

VIP WORLDWIDE

Find your contact now!