After the opening, there were massive problems with the coating of the pool areas. In addition to leaks, there were also color changes. In order to eliminate these as quickly as possible, VIP was commissioned with the renovation and recoating of the system. All work was carried out quickly and efficiently. This enabled the hotel to minimize downtime and minimize costs.
Sealing of the pool areas
Belek
Egypt
2011
5200 m²
Concord El Salam Resort & Spa
El Salam for touristic investment
Batsi - (Batiment De Specialite Industriel) PLANER El Salam for touristic investment
VIP Coatings Intl GmbH & Co.KG (EN)